CIPP Installation in Ft Lauderdale | Cured In Place Pipe

Owner Dennis Gray sets up for a pull in place CIPP installation in Ft Lauderdale. This process involves wetting the liner out with an ambient cure two part epoxy. Once the liner is 100% impregnated the liner is pulled into place without any digging in most cases. Tampa Bay Plumbers typically uses an air inversion process, but used the pull in place method because of the pipe size and configuration. Once this line is cured in 3 hours we will have lined every horizontal pipe in the 33 unit apartment building.

 

[button link=”http://tampaplumber.net/pipelining-tampa.html” color=”red”] Cured In Place Pipe[/button]